Containment Well Cellar Installation

Installation of your Cellar Tech Containment Well Cellar is a straight forward exercise requiring basic excavating equipment. A small crew can install multiple cellars in a single day and our Containment Well Cellars can be installed simultaneously while conductors are being set on the same pad.  Cellar Tech currently offers installation services for our Containment Well Cellars as well as conductors in the Marcellus and Utica Shale Plays.  More information please contact us today or visit our services page.

Download our informative Cellar Tech presentation  (PDF) document for more information and pictures of the process.

Basic Installation Process

Install the conductor in the normal fashion. Excavate around the conductor 3-6” deeper than the cellar.

Step 1: Install the conductor in the normal fashion.
Excavate around the conductor 3-6” deeper than the cellar.

Lower the cellar over the conductor and bed into the sand or gravel.

Step 2: Lower the cellar over the conductor and bed into the sand or gravel.

Weld the extension ring to the conductor.

Step 3: Check final orientation and elevation, weld the extension ring to the conductor.

install7

Step 4: Back fill around the cellar with suitable material and install cover plate or grating.

Upon completion, you will have a well cellar that:

  • Lowers costs over the lifetime of the well
  • Improves environmental stewardship
  • Increases worker safety in and around the well cellar.